Construction Results (Fujinetsu Co., Ltd.)

Small scaling was specially utilized in order to capture the image of the city in our building. As an added twist, we also made sure to place and scale the objects in our building with consideration to the visual perspective of a child.

Owner Mitsui Fudosan Co., Ltd., KCJ GROUP Inc.
Location Nishinomiya, Hyogo
Completion
Date
March 2009
Scale and
Structure
Above Ground: 4 Floors
S Structure
Total Floor Area: 14935.53m2
Air-
Conditioning
Equipment
Air-Cooled Heat Pump with Air-Conditioning (42 Lines)
Sanitation
Equipment
Water Supply and Drainage Facilities for Each Pavilion

Main Construction Results

  • Tachikawa City Hall
  • Nakano Central Park East
  • Hirokoji Aqua Place
  • Nihon University of International Relations Mishima Station North Exit Campus
  • Konan University, Nishinomiya Campus (CUBE)
  • Hirakata Comprehensive Development Medical Center
  • Keio University Hospital
  • Comprehensive Welfare Facilities Kasumi no Sato
  • Long-Term Health Care Facility Hohoemi no Sato
  • LOTTE Urawa Factory
  • Nippon Ham Factory Ibaraki Plant
  • Unicharm Shikoku Factory
  • ToBiO (Furuhashi Hironoshin Memorial Hamamatsu Swimming Center)
  • KidZania Koshien
  • Bellfa Miyakojima Shopping Center
  • La-la Port Koshien
  • LOTTE City Hotel Kinshicho
  • Aeon Mall Tsukuba