Construction Results (Fujinetsu Co., Ltd.)

Back to Fujinetsu Co., Ltd. Construction Result List

Hirakata Comprehensive Development Medical Center

Because air-conditioning must be operational even during a power failure, a ceiling ventilation system (Wimboeck Ceiling Ventilation System) has been adopted.

Owner Social Welfare Corporation Hirakata Ryoikuen
Location Hirakata, Osaka
Completion
Date
March 2013
Scale and
Structure
Below Ground: 1 Floor
Above Ground: 4 Floors, 1 Penthouse Floor
RC Structure
Total Floor Area: 10295.21m2
Air-
Conditioning
Equipment
2x Absorption-Type Hot and Cold Water Generators, FCU + AHU Air Conditioning, EHP and GHP Air Conditioning, 3x 31kw Micro-Cogenerators for Wasted Heat Utilization.
Sanitation
Equipment
2x 90t Receiving Tanks, 4 Water Supply Pressure Pumps, Water Feed Supply to Each Building and Room, 5x Vacuum-Type Water Heaters and (2x10t and 1x4t) Hot Water Storage Tanks to Supply Each Building and Room with Hot Water.
Other
Equipment
Ceiling Ventilation System (Wimboeck Ceiling Ventilation System), Floor Heating Equipment, Medical Gas Equipment, Hood Fire Extinguisher System, Sprinkler Fire Extinguisher System, Ozone Deodorization Equipment.

Main Construction Results

  • Tachikawa City Hall
  • Nakano Central Park East
  • Hirokoji Aqua Place
  • Nihon University of International Relations Mishima Station North Exit Campus
  • Konan University, Nishinomiya Campus (CUBE)
  • Hirakata Comprehensive Development Medical Center
  • Keio University Hospital
  • Comprehensive Welfare Facilities Kasumi no Sato
  • Long-Term Health Care Facility Hohoemi no Sato
  • LOTTE Urawa Factory
  • Nippon Ham Factory Ibaraki Plant
  • Unicharm Shikoku Factory
  • ToBiO (Furuhashi Hironoshin Memorial Hamamatsu Swimming Center)
  • KidZania Koshien
  • Bellfa Miyakojima Shopping Center
  • La-la Port Koshien
  • LOTTE City Hotel Kinshicho
  • Aeon Mall Tsukuba