Because air-conditioning must be operational even during a power failure, a ceiling ventilation system (Wimboeck Ceiling Ventilation System) has been adopted.
2x Absorption-Type Hot and Cold Water Generators, FCU + AHU Air Conditioning, EHP and GHP Air Conditioning, 3x 31kw Micro-Cogenerators for Wasted Heat Utilization.
Sanitation Equipment
2x 90t Receiving Tanks, 4 Water Supply Pressure Pumps, Water Feed Supply to Each Building and Room, 5x Vacuum-Type Water Heaters and (2x10t and 1x4t) Hot Water Storage Tanks to Supply Each Building and Room with Hot Water.
Other Equipment
Ceiling Ventilation System (Wimboeck Ceiling Ventilation System), Floor Heating Equipment, Medical Gas Equipment, Hood Fire Extinguisher System, Sprinkler Fire Extinguisher System, Ozone Deodorization Equipment.
Main Construction Results
Tachikawa City Hall
Nakano Central Park East
Hirokoji Aqua Place
Nihon University of International Relations Mishima Station North Exit Campus
Konan University, Nishinomiya Campus (CUBE)
Hirakata Comprehensive Development Medical Center
Keio University Hospital
Comprehensive Welfare Facilities Kasumi no Sato
Long-Term Health Care Facility Hohoemi no Sato
LOTTE Urawa Factory
Nippon Ham Factory Ibaraki Plant
Unicharm Shikoku Factory
ToBiO (Furuhashi Hironoshin Memorial Hamamatsu Swimming Center)